CVE 4070 Building Construction Process Assignment
WE WRITE ESSAYS FOR STUDENTS
Tell us about your assignment and we will find the best writer for your project
Write My Essay For MeCON 2001/CVE 4070 HW 03
This homework assignment will require you to read the construction documents for the Moonian Office
Project. In-class lectures will also be helpful in working the problems.
1. (6 points) Review the site development plans and estimate the construction cost of the following based
on the given square foot costs which include materials, labor and equipment, overhead, and profit.
a. The concrete walkways on the North and East side of the property ($4.75 per square foot).
b. The concrete driveway approach on Eight Street ($6.20 per square foot).
c. The asphalt parking lot ($3.45 per square foot).
2. (6 points) Site development features in Seminole County Florida have to comply with the design
requirements stated in the Seminole County Public Works Engineering Manual (available online). Look
up this document and find the diagram T-4 which illustrates requirement for driveways that are
connected to a two-way street. Determine the required radius for the concrete drive approach shown on
the site plan.
3. (6 points) The exterior walls of the Moonian office building are
8x8x 16 inch CMUs (concrete masonry units). Estimate the number
of CMUs needed to construct the building exterior walls. When
doing this estimate, account for the window and door openings.
Include 5% additional allowance for cut and waste.
4. (6 points) Estimate the amount (cubic yards) of concrete needed to construct the building foundation
wall footings and slab. There are no interior columns or interior bearing walls. Base your calculations
on Detail 1, sheet D1. Disregard references to Detail 16, sheet D1 at windows. Include 5% additional
allowance for waste.
5. (6 points) A client has asked you to build an exact duplicate of the Moonian office building in the City
of Melbourne, FL. She has found a parcel of land near downtown Melbourne zoned R-P
(Residential/Professional Office). The land parcel is 75-feet wide and 75-feet deep (see figure below).
Research the City of Melbourne Land Development Code and Building Code requirements to find
answers to the following:
a. What are the minimum building setback requirements (front, rear, sides) for this property? Will
you be able to fit the office building on this land?
b. An office building is considered a commercial building by the City of Melbourne. Knowing this,
determine the current required building codes (building, electrical, mechanical, and fire
protection) with which the building design has to comply.
c. Brevard County has created a Wind Speed Mapping System to assist in determining the wind
speed zones of properties located in the County. Look up the wind map and determine the wind
zone in which the City of Melbourne is located.
75 ft
75 ft
Zoned
R-P
Florida Tech Ave
Existing
building
Existing
building
Existing
building
The post CVE 4070 Building Construction Process Assignment appeared first on Grade Master-Pro.
Write my Essay. Premium essay writing services is the ideal place for homework help or essay writing service. if you are looking for affordable, high quality & non-plagiarized papers, click on the button below to place your order. Provide us with the instructions and one of our writers will deliver a unique, no plagiarism, and professional paper.
Get help with your toughest assignments and get them solved by a Reliable Custom Papers Writing Company. Save time, money and get quality papers. Buying an excellent plagiarism-free paper is a piece of cake!
All our papers are written from scratch. We can cover any assignment/essay in your field of study.
